TH3.L6: Calibration and Validation of S-NPP and GOES-R Instruments |
Session Type: Oral |
Time: Thursday, July 27, 13:40 - 15:20 |
Location: Room 202 CD |
Session Chairs: James Tilton, NASA, GSFC and Spencer Farrar, Aerospace Corp. |
13:40 - 14:00 |
TH3.L6.1: ON-ORBIT MEASUREMENT OF THE FOCAL LENGTH OF THE SNPP VIIRS INSTRUMENT |
James Tilton; NASA Goddard Space Flight Center |
Robert Wolfe; NASA Goddard Space Flight Center |
Guoqing (Gary) Lin; Science Systems and Applications, Inc. |
Zhangshi (Albert) Yin; Science Systems and Applications, Inc. |
14:00 - 14:20 |
TH3.L6.2: S-NPP VIIRS THERMAL EMISSIVE BAND THERMAL CALIBRATION ERRORS AND THEIR IMPACT ON BLACKBODY WARM UP AND COOL DOWN F FACTORS |
David Moyer; The Aerospace Corporation |
Frank De Luccia; The Aerospace Corporation |
Gabriel Moy; The Aerospace Corporation |
14:20 - 14:40 |
TH3.L6.3: DEVELOPMENT OF LEVEL 1B CALIBRATION AND VALIDATION READINESS, IMPLEMENTATION AND MANAGEMENT PLANS FOR GOES-R |
David Kunkee; The Aerospace Corporation |
Robert Farley; The Aerospace Corporation |
Betty Kwan; The Aerospace Corporation |
James Hecht; The Aerospace Corporation |
Richard Walterscheid; The Aerospace Corporation |
Seth Claudepierre; The Aerospace Corporation |
Rebecca Bishop; The Aerospace Corporation |
Lynette Gelinas; The Aerospace Corporation |
Tamitha Skov; The Aerospace Corporation |
Frank De Luccia; The Aerospace Corporation |
14:40 - 15:00 |
TH3.L6.4: IMPROVEMENTS IN VIIRS REFLECTIVE BAND CALIBRATION ACCURACY AND STABILITY PROVIDED BY RSBAUTOCAL |
Evan Haas; The Aerospace Corporation |
Frank De Luccia; The Aerospace Corporation |
15:00 - 15:20 |
TH3.L6.5: S-NPP VIIRS DAY-NIGHT BAND CALIBRATION AND STATUS UPDATE |
Spencer Farrar; The Aerospace Corporation |
Tim Wilkinson; The Aerospace Corporation |
Frank De Luccia; The Aerospace Corporation |